Case study
Mikwendan Kitchen: How I Build with Claude
I solo built a production operations app for my food business with Claude Code over two weeks. I run my kitchen on it every day, and I'm still improving it.
How I Build
- 176 merged PRs
- 113,761 lines of code
- 126 database tables
- 86 MCP connector tools
- 9 integrations
- 1,005 passing tests
Reach: The 86 MCP connector tools let Claude run daily operations by voice. The 9 integrations include Square, Twilio, Gmail, Google Maps and the Anthropic API.
Checks: Every change goes through staging and automated AI code review. Nothing deploys straight to production.
Planner and builders: A planner model writes the spec and builds the core. Lower-cost models build the rest in parallel, and I pick the model and effort level for every task. So far I've had as many as nine Claude Code sessions running at once, with only one on Fable, the top model.
Connector evals: A fixed eval set runs on every new branch. It covers reads, writes at each permission level, and prompts the connector should refuse, each with an expected answer. Current score: 20 out of 20.
Needs human decision: Builders make small calls on their own and write them down for me to check. Anything critical stops right away. It gets a "needs human decision" label with the options and the builder's pick, and a nightly email lists those items for my morning planning call. Nothing big gets built on a guess, and everything else keeps building.
How I Steer Claude
Claude can do a lot on its own, but it can use more than it needs and make calls that aren't its to make. Three examples:
- Real security gaps, caught before customer data. The app worked, and Claude's code looked ready. I didn't take that on faith with customer data, so I ran an overnight security and QA review first. It came back no-go: test runs could deploy to production, and a test password had leaked. We closed every gap before any customer data went in.
- Too much top-model usage. Claude proposed building two entire phases on Fable. Before approving, I kept Fable to planning and the tricky core and moved everything else to lower-cost models. Every build runs that way now.
- A builder made a critical call on its own. Error tracking came back different from what we'd agreed, and Claude had skipped the plan's other judgment calls. We reviewed all eight together, and I added the critical-choices rule to every part of the plan.
Product Decisions
The problems I had running my kitchen business became the first user story. Initial decisions came from that, and others came from catching what the plan missed. A few examples:
Approve is always a tap, never voice
Problem: I talk to Claude all day while I cook, and it can mistake casual talk for an approval.
Decision: Anything waiting on me goes through only when I tap Approve in the app.
Changes I ask for happen, changes Claude starts get verified
Problem: If I confirmed every change, I'd be the bottleneck. If I confirmed nothing, Claude would be deciding on its own.
Decision: What I ask for just happens, and what Claude starts on its own comes back to me. I'm the check on Claude without slowing down my own requests.
Plan by voice, work in the app
Problem: The spec had an on-screen daily planner, and I realized I wasn't using it because I tend to plan out loud while I'm working in the kitchen.
Decision: I plan my week and my morning by voice with Claude, and the app stores and shows the plan.
The app warns and doesn't block
Problem: Hard rules I set early kept getting in the way of real work.
Decision: New rules now start as warnings, and I decide. Once a workflow settles, I tighten them into hard rules.
What Changed
The app replaced a lot of hand work, and it catches things I'd have missed.
| Area | Before | Now |
|---|---|---|
| Claude connector | Copy-pasting recipes, batch notes, costs and emails into chat to plan my day, test recipes and draft replies, then typing results back by hand | Claude works in the app directly, saving 5 hours a week and preventing errors from stale data. |
| Production planning | Recipes off emails and index cards, scaled with a calculator | No more incorrect measurements or missed ingredients. |
| Events | Applications scattered across task software | One place for deadlines and decisions, so nothing slips (like a special events permit I didn't know I needed). |
| Costing | Pricing by feel | Real cost per item, which made gift boxes possible as a new product. |
| Email triage | Gmail by hand | Emails that need me get flagged (like a sticker proof I didn't know needed approval). |
At Enterprise Scale
I've deployed enterprise software for almost two decades. At company scale, here's where I'd start:
- Talk to users first. Before deciding what a rollout looks like, I'd sit with representative users from each persona and learn how the work really runs.
- Settle hard-to-undo choices first. In the early 2010s I led the rollout of a company-wide environmental and safety management system at PaperWorks to 1,400 employees across 26 sites in two countries. Rollouts like that force big decisions early that you can't easily change, and that's shaped how I think about product design ever since. It's where my critical-choices rule comes from.
- Single sign-on and roles. One login, and each person sees and does only what their role needs.
- Each customer's data walled off. Separated in the database itself, so one customer can never see another's.
- Audit logs. The app already logs every change Claude makes, with an undo. At scale I'd extend that to every person and every connected system, so anyone can see who changed what and when.
- Fit into the tools people already use. Before building anything new, I'd map what's already in place and connect to it instead of replacing it. I've done this by leading major software rollouts at OneTeam, Afference and OverActive across project management, finance, legal and operations, and by launching a self-hosted SharePoint at PaperWorks.